A New 125KW Blue Star generator installation at a new development in Lakeland FL

A New 125KW Blue Star generator installation at a new development in Lakeland FL called “Laurel Highlands” by Mid Florida Diesel.
My technician is performing a factory start-up to ensure it was installed correctly and that the generator meets the specifications for this job and can carry the load at the lift station.

This entry was posted in Blue Start Power Systems, Diesel Generator, Project. Bookmark the permalink.