Tag Archives: City of Lakeland

City Of Lakeland Electric Building Project

Mid Florida Diesel, Inc was part of the team to remove an existing 300KW Caterpillar generator and install a new VD500KW Blue Star Power Systems generator, with a 1000 gallon and a 500 gallon Convault Diesel fuel tanks, and 2 Continue reading

Posted in Blue Start Power Systems, Diesel Engine, Diesel Generator, Mid Florida Diesel, Project, Services | Tagged , , , , , , , | Comments Off on City Of Lakeland Electric Building Project

“OUT WITH THE OLD IN WITH THE NEW” said the CITY OF LAKELAND WASTE WATER DEPARTMENT!

Mid Florida Diesel recently replaced a 400kw Caterpillar generator with 415kw Blue Star Power Systems generator! This unit is packaged with a nice John Deere engine, inside a Level III – Legacy, which is a sound attenuated Aluminum Enclosure. Due Continue reading

Posted in Blue Start Power Systems, Diesel Generator, Energy, Generators, Maintenance, Mid Florida Diesel, News, Project | Tagged , , , , , , , | Comments Off on “OUT WITH THE OLD IN WITH THE NEW” said the CITY OF LAKELAND WASTE WATER DEPARTMENT!